Dap ready mixed concrete patch is an acrylic latex water based formula as such the sole drying mechanism is the evaporation of water.
Dap ready mix concrete patch drying time.
It is a pre mixed concrete patch that enables you to deal with small to large holes just after filling and scraping the rest wait for 24 hours to harden then wash it with water.
Ready to use formula dries to a hard durable finish for repairing holes cracks and breaks in concrete and masonry surfaces.
Speaking of water dap has water resistance over time so that it is suitable for the humid and rainy climate as well as outdoor projects.
Patched areas may be painted with a quality latex paint after 2 to 4 hours or alkyd paint after 24 hours if desired.
T if desired after product has achieved full cure in approximately.
Ready mixed concrete patch best for.
Dap pre mixed concrete patch does not require the application of paint.
Ready mixed concrete patch helps repair holes cracks and other imperfections in concrete or masonry surfaces.
I am involved with a large urban concrete project where concrete delivery is sometimes delayed by traffic congestion.
Patched areas may be painted with a quality latex pain.
Longer dry times may be required when the patch is applied in deep fills and or when applied under cool and or humid conditions.
Used to patch small cracks and breaks or spot level concrete and masonry surfaces such as basement walls patios steps sidewalks and driveways.
Dry time can be significantly impacted by cool or humid application conditions moisture in the application surfaces or by thick deep applications of the product.
Consistency paste vehicle latex emulsion solid content 83 1 application temperature temperatures greater than 40 f drying time allow to dry 24 hours before driving over patched area.
For extra adhesion in heavy traffic area prime area to be patched.
A ready to use mixture ideal for patching small cracks and breaks or to spot level concrete and masonry surfaces such as basement walls patios steps sidewalks and driveways.
Ideal for basement walls patios steps sidewalks and driveways.
If you wish to paint the patched areas may be painted with a quality latex paint after 2 to 4 hours or alkyd paint after 24 hours if desired.
The specification requires concrete placement within 90 minutes of batching at the plant.